Nonso NwachukwuNONSO NWACHUKWUNDC · Nigeria Democratic CongressNnewi South IAnambra State House of Assembly

Nnewi South I · 2027–2031

Legislative Intervention Agenda

Ten priority issues for Nnewi South I, each with specific targets, the ministries and agencies responsible, and measurable outcomes. This is the yardstick constituents can hold their Member to: every motion moved and every bill sponsored should advance one of these ten.

1

Erosion control and gully rehabilitation in Utuh, Amichi, Unubi and other threatened communities

Active gullies are advancing on homes, farmland, roads and public buildings, and grow worse every rainy season.

Targets

  • Every active gully site in Nnewi South LGA assessed and published on a risk-ranked list within 60 days of the motion's adoption.
  • Emergency stabilisation at the highest-risk sites before the first rainy season of the term.
  • Full rehabilitation of at least three priority gully sites under contract by the end of 2029.

Responsible

  • Anambra State Erosion, Watershed and Climate Change Agency
  • Ministry of Environment
  • Ministry of Works
  • State Emergency Management Agency

Measured by

  • Number of active gully sites stabilised or rehabilitated
  • Homes, roads and hectares of farmland protected
  • Federal and development-partner co-financing secured
  • Households displaced by erosion assisted
2

Construction and maintenance of drainage systems

Roads without drains flood, wash out and feed new gullies; existing drains are rarely desilted.

Targets

  • A drainage plan for the main towns and roads of Nnewi South published within six months.
  • Covered drains built on the worst-flooded roads, starting in the first budget of the term.
  • Every primary drain desilted before each rainy season.

Responsible

  • Ministry of Works
  • Anambra State Environmental Protection Agency
  • Nnewi South Local Government Council

Measured by

  • Kilometres of drains built or rehabilitated
  • Recorded flood points eliminated
  • Share of primary drains desilted each year
3

Building control and physical planning to curtail erosion

Building across waterways, on gully edges and without soakaways concentrates runoff and creates new gullies.

Targets

  • Erosion-risk maps with gully buffer zones published for Nnewi South within six months.
  • Drainage and soakaway conditions on 100% of new building approvals within three months.
  • No new building approvals inside mapped buffer zones.

Responsible

  • State physical planning and building control authority
  • Erosion, Watershed and Climate Change Agency
  • Ministry of Lands

Measured by

  • Share of approvals carrying drainage conditions
  • Approvals in buffer zones (target: zero)
  • Enforcement actions published each quarter
4

Extension of rural electrification and power for production

Some communities have no grid connection; others have broken transformers or abandoned projects, and businesses run on generators.

Targets

  • A public list of every unserved community and abandoned electrification project in Nnewi South within 90 days.
  • Every abandoned project on the list completed within 18 months.
  • All primary healthcare centres in Nnewi South solarised within 18 months.

Responsible

  • Ministry of Power
  • Rural Electrification Agency
  • Enugu Electricity Distribution Company
  • Licensed mini-grid developers

Measured by

  • Communities newly connected
  • Markets and production clusters with reliable supply
  • Public facilities solarised
5

Assessment and rehabilitation of primary healthcare centres

Many centres lack staff, medicines, equipment, power and water, so residents travel further and pay more for basic care.

Targets

  • Every PHC in Nnewi South assessed and the results published within 90 days.
  • Every PHC in Nnewi South at the published minimum standard within 36 months of the Law's commencement.
  • One 24-hour maternity centre in every ward.

Responsible

  • Ministry of Health
  • State Primary Healthcare Development Agency
  • Anambra State Health Insurance Agency

Measured by

  • Centres meeting the minimum standard
  • Wards with 24-hour maternity services
  • Essential-medicine availability
  • Vulnerable residents enrolled in health insurance
6

Technical and vocational education development

Young people have no functional skills centre close to home, and technical colleges lack equipment and instructors.

Targets

  • A functional skills centre in Nnewi South offering certified training in at least six trades within 24 months.
  • Every government technical college audited against national standards within 90 days.
  • At least 20 local employers taking trainees on industrial attachment.

Responsible

  • Ministry of Education
  • Ministry of Youth
  • Technical and Vocational Skills Council (once established)
  • Employers in Nnewi and its environs

Measured by

  • Trainees enrolled and certified
  • Trainees placed with employers
  • Graduates in work or business 12 months on
7

Development of agricultural value chains

Farmers sell raw produce at harvest-time prices, inputs arrive late, and there is little local storage or processing.

Targets

  • A cooperative-run aggregation and storage centre operating in Nnewi South within 24 months.
  • At least two processors for local crops signed up.
  • Inputs delivered at least two weeks before planting, with beneficiary lists published, every season.

Responsible

  • Ministry of Agriculture
  • Registered farmer cooperatives
  • Investment promotion agency

Measured by

  • Farmers registered and in cooperatives
  • Tonnes aggregated and stored
  • Estimated post-harvest losses
  • Farm-gate prices for principal crops
8

Improvement of market infrastructure and an end to illegal levies

Markets lack drainage, toilets, water, fire safety and lighting, while traders pay multiple, unreceipted levies.

Targets

  • Every public market in Nnewi South I assessed within 90 days.
  • The most deficient markets rehabilitated, starting in the first budget of the term.
  • Every lawful levy published at the market entrance, and 100% receipted.

Responsible

  • Ministry of Commerce and Trade
  • Ministry of Works
  • State Fire Service
  • Nnewi South Local Government Council

Measured by

  • Markets meeting basic infrastructure standards
  • Markets with published levy lists
  • Complaints of illegal levies received and resolved
9

Youth enterprise and apprenticeship programmes

Many young people leave school with no master to serve, no capital and no route into work.

Targets

  • A first cohort of 200 young people placed with established businesses within 12 months.
  • At least 40% of places for young women.
  • Every graduate given a start-up package or a loan referral.

Responsible

  • Ministry of Youth
  • Ministry of Commerce and Industry
  • SMEDAN
  • Partner banks and microfinance institutions

Measured by

  • Young people placed, trained and settled
  • Share still in business 12 months later
  • Apprenticeship agreements registered and disputes resolved
10

Rural and farm-to-market roads

Bad rural roads raise transport costs, spoil produce, cut communities off from care and accelerate erosion.

Targets

  • A condition survey of Nnewi South's rural roads published within 90 days.
  • A first package of priority roads, with drains, contracted in the first budget of the term.
  • Every ongoing road contract published with its cost, contractor and completion date.

Responsible

  • Ministry of Works
  • State road maintenance agency

Measured by

  • Kilometres of rural road rehabilitated with drainage
  • Communities with all-season road access
  • Road contracts completed on time
ⓘ

Targets are proposed ahead of the 2027 legislative term and will be refined against the baseline assessments the motions call for. Progress against each target will be reported publicly on the Accountability Dashboard.