MotionSubstantive Motion · DraftErosion, Drainage and Building Control

Motion on the Need to Enforce Building Control and Physical Planning Standards to Curtail Gully Erosion in Anambra State

Urges the State's physical planning and building control authorities to stop building in gully buffer zones and waterways, make drainage and soakaways a condition of every building approval, and publish erosion-risk maps for Nnewi South and other affected areas.

Published 2026-11-16

Background

Much of the gully erosion in Anambra State is made worse by how and where we build. Houses and fences are put up across natural waterways, compounds are fully paved with no soakaway, roofs and yards discharge runoff straight onto bare earth, and plots are cut into the edges of existing gullies.

Each of these choices concentrates rainwater and sends it, faster and in greater volume, onto unprotected soil. The result is new gullies and the acceleration of existing ones. Remediation projects can also be undermined within a few years if new building continues uncontrolled around them.

The State already has physical planning and building control laws. The problem is enforcement: building approvals rarely require on-site drainage or soakaways, setbacks from gullies and waterways are not mapped or policed, and residents are often unaware that a plot sits in a high-risk zone. Fixing that is far cheaper than repairing the damage afterwards.

Anambra State House of Assembly

Motion on the Need to Enforce Building Control and Physical Planning Standards to Curtail Gully Erosion in Anambra State

Moved by the Honourable Member representing Nnewi South I Constituency

The House:

  1. 1.Notes that uncontrolled building across natural drainage channels, inadequate on-site drainage and construction close to gully edges are major causes of new and accelerating gully erosion in Anambra State;
  2. 2.Aware that existing physical planning and building control laws in the State give the relevant authorities power to set conditions on building approvals and to stop development in unsafe locations;
  3. 3.Concerned that these powers are not consistently used to prevent erosion, that erosion-risk zones are not mapped and published, and that new building around remediated sites can undo costly public works;
  4. 4.Believes that preventing erosion through sensible building control protects households, saves public money and is the responsibility of planning authorities and property owners alike;

Prayers

The Member accordingly prays the House to resolve to:

  1. i.Urge the State's physical planning and building control authority, with the Anambra State Erosion, Watershed and Climate Change Agency, to prepare and publish erosion-risk maps showing gully buffer zones and natural waterways, beginning with Nnewi South and other severely affected Local Government Areas;
  2. ii.Urge the authority to make on-site drainage, soakaways or rainwater harvesting, and the safe discharge of runoff, a condition of every new building approval, and to publish simple guidance for property owners in English and Igbo;
  3. iii.Urge the authority to stop the approval of new buildings within mapped gully buffer zones and natural waterways, and to enforce existing stop-work powers against development that blocks drainage channels;
  4. iv.Urge the State Government to protect every completed erosion-control project with a declared buffer zone in which further building is not permitted;
  5. v.Urge the State Government to run a public-awareness campaign, through town unions, churches and traditional rulers, on how building practices cause erosion;
  6. vi.Mandate the House Committee on Physical Planning and Urban Development to follow up and report back to the House within eight weeks.

Proposed Resolutions

If the House adopts the motion, each resolution is tracked publicly against the authority responsible, a measurable target and a deadline.

ResolutionResponsibleTargetTimeline
Erosion-risk maps with gully buffer zones and waterways publishedPhysical planning and building control authority; Erosion AgencyMaps published for Nnewi South first, then every high-risk LGAWithin 6 months
Drainage and soakaway conditions on every building approvalPhysical planning and building control authority100% of new approvals carry drainage conditionsWithin 3 months
No new approvals in mapped buffer zones; stop-work enforcementPhysical planning and building control authorityZero new approvals in buffer zones; enforcement actions published quarterlyFrom publication of the maps
Buffer zones declared around completed erosion projectsErosion Agency; Ministry of LandsEvery completed project protectedWithin 6 months
Committee follow-upHouse Committee on Physical Planning and Urban DevelopmentReport laid before the HouseWithin 8 weeks
ⓘ

This is a draft motion prepared ahead of the 2027 legislative term. It has not been moved or adopted by the Anambra State House of Assembly.